Reinforcement before the pour
Open for A few hoursBar positions, lap lengths, cover and the spacers. Once the concrete is in, only what was checked beforehand still counts.
Site supervision Wegberg Wegberg Kreis Heinsberg
Every building site has parts that are visible for a few hours only. After that there is concrete over them, or plaster, or a lining. Anyone who does not look during those hours can afterwards only guess. We come for the visits where that difference is made.

Your name, a phone number and a few sentences about the site are enough. We call back and tell you which visits really matter in your programme and what supervision would mean in your case.
The enquiry commits you to nothing. You get a quotation once the scope is clear.
Site supervision is largely a question of timing. These four states are open for a short while and then closed for the life of the building. A visit for them is in the diary before the contractor turns up.
Bar positions, lap lengths, cover and the spacers. Once the concrete is in, only what was checked beforehand still counts.
Junctions with rising elements, penetrations and transitions. Finding a leak under a finished build up costs many times what a visit costs.
Runs, boxes and openings are recorded while they are still visible. Everyone who later wants to drill into a wall needs those records.
Grid dimensions, openings, bearings and connections against the working drawing. After drylining and facade every correction is a demolition.
NoteWhat is recorded inside those windows can later be evidenced. What is not recorded stays one assertion against another.
A site visit is not a stroll around the plot. It follows a fixed order, and it ends with something written that reaches you the same day.
First we note how far the site has got, which contractors are working and what the weather was. Those notes carry every later statement about programme.
Then the element itself is examined, with the drawing and the calculation alongside. Measurements are taken where a deviation would have consequences, not evenly everywhere.
A great deal is settled on the spot while the people involved are still standing there. What cannot be settled is described and located.
Anything touching cost, programme or structural safety reaches you the same day. The rest goes into the running record.
Is a visit coming up where somebody ought to be present? Give us the date and we will tell you whether we can make it.
Send enquiryThe supervision as a whole, or individual services from it. Both are possible, even where the design and the structural calculations have long sat with another office.
Not sure which scope suits your site? Describe it briefly, placing it costs nothing.
Go to the enquiry formThe second half of site supervision does not happen on the scaffold but at the desk. It decides what a site ends up costing.
Quantities are taken while the element is still accessible. An invoice for a quantity nobody can measure any more can only be believed or refused.
A variation is examined before the work is carried out. Afterwards the price is a negotiation without an alternative, because the element already stands.
Interim invoices are held against the actual state of the works and not against the calendar. Payment ahead of the work is the commonest avoidable loss.
NoteWe check and we recommend. Nothing is released without you, and nothing is ordered that you do not know about.
The photographs show the states this page is about, in the order in which they occur on a building site.
NoteThe photographs illustrate typical construction states. They do not show particular projects of the office.
What stands on the site is not a rotating team but the office itself. These are the qualifications behind it, each with its number and the year it was obtained.

NoteFor individual services the office works with freelancers, partners and building contractors from North Rhine-Westphalia.
The office sits in Wassenberg, a good twenty minutes by car from most of the Wegberg villages. On a supervised site that closeness is not a detail: a visit that becomes necessary at short notice has to be possible at short notice.
Places whose sites we drive to
NoteIf your place is not on the list, ask anyway. Within North Rhine-Westphalia something can almost always be arranged.
What clients in Wegberg most often want to know before they commission supervision.
The contractor has its own site management, and that represents the contractor. Supervision on the client side looks at the same site, but from your point of view. The two do not exclude each other, they are two different roles.
To the programme, not to the calendar. During foundations and the structural shell the visits are close together, because elements disappear there. During fit out it is more about the interfaces between trades. We agree the rhythm at the start.
Yes. We then first record what has already been built and fix that state, so it is later clear what predated our involvement. The earlier we start, the more of it is still visible.
No. The contractor owes its work under the contract and under the recognised rules of technology, and that stays where it is. Supervision makes sure deviations are noticed while they can still be put right.
The fee follows the German HOAI scale and depends on the scope and on how long the site runs. You get a quotation beforehand that describes the scope. Individual visits can also be commissioned separately.
The running record of the visits with the state of the works and photographs of the construction states, together with the measured quantities needed for accounting and the reports of deviations with their dates.
Yes, both sit in the office. That is not a requirement for supervision, but it helps: whoever calculated the structure knows on site where a deviation really counts.
Your name, a phone number and a few sentences about the site are enough. We call back and tell you which visits really matter in your programme and what supervision would mean in your case.
Send enquirySmoku eG, Ingenieurbüro Konrad Smoczynski
Leichweg 3
41849 Wassenberg
Deutschland
Vorstand: Konrad Smoczynski
M. Sc. RWTH Konrad Smoczynski, civil engineer
Phone: +49 2432 907 93 00
Email: info@ks-ingenieur.de
Website: https://ks-ingenieur.de
M. Sc. RWTH Konrad Smoczynski
Leichweg 3, 41849 Wassenberg
Professional title: civil engineer, awarded in the Federal Republic of Germany
Qualified structural designer, authorisation number QT1542
Entitled to submit building documents in North Rhine-Westphalia, authorisation number V3693
The German engineering act, the chamber of engineers act, the professional code and the HOAI fee scale apply.
Ingenieurkammer Bau NRW
Zollhof 2, 40221 Düsseldorf
Membership number: 730097
VHV Allgemeine Versicherung AG
Westfalendamm 223, 44141 Dortmund
Geographic scope of cover: Deutschland
VAT identification number under section 27a of the German VAT Act: DE455004862
We are neither willing nor obliged to take part in dispute resolution proceedings before a consumer arbitration body.
The content of this page was prepared with care. We cannot warrant that it is correct, complete or up to date.
The operators of linked pages are responsible for their content. No infringements were apparent at the time the links were set.
M. Sc. RWTH Konrad Smoczynski, Smoku eG, Ingenieurbüro Konrad Smoczynski, Leichweg 3, 41849 Wassenberg
Phone: +49 2432 907 93 00. Email: info@ks-ingenieur.de
This page consists of static files. When you open it your browser transmits technically necessary data to the server, including IP address, time, the file requested and the browser identifier. That data is processed to deliver the page and to keep the service secure. The legal basis is article 6(1)(f) GDPR.
When you submit the form, your name, your phone number, your email address if you give one and your notes about the site go to the Olumax platform, which operates this page technically and passes the enquiry on to us. We process the details solely in order to deal with your enquiry. The legal basis is article 6(1)(b) and (f) GDPR.
The details are erased as soon as they are no longer needed and no statutory retention period stands in the way.
This page sets exactly one cookie, named site_lang. It stores the language you chose and expires after a year. It is technically necessary within the meaning of section 25(2)(2) TDDDG. There is no analytics and no advertising.
When the start page loads, the stored value is read first. If it holds en, pl or ru you are taken once to the page in that language. If it holds de, an unknown value or nothing at all, you stay on the German page. The language pages never forward you, they only write their own code into the cookie when they load.
There are no analytics services, no advertising networks, no fonts from other servers and no embedded content from other providers.
You have the right of access, rectification, erasure, restriction of processing, data portability and objection. Please write to info@ks-ingenieur.de.
You may also complain to a data protection supervisory authority, in North Rhine-Westphalia to the State Commissioner for Data Protection and Freedom of Information.
This page sets a single cookie, and only because the language choice would not work otherwise.
Name: site_lang. Purpose: to remember the language you chose. Lifetime: one year. Path: the whole site. SameSite: Lax.
The start page reads this value first. With en, pl or ru you are taken once to the page in that language; with de, with an unknown value and with no cookie at all you stay on the German page. Every language page writes its own code when it loads and never forwards you.
A cookie that stores nothing but a choice you made yourself is technically necessary. Under section 25(2)(2) TDDDG it needs no consent. That is why you get a notice and not a prompt that blocks the page.
You can delete the cookie in your browser at any time. Without the cookie the start page shows the German version. You can pick the language at any time from the selector in the page header.